Densest data center market in the world; interconnection queue and rate pressure are active policy issues.
Supply as reported: Grid, PJM
A photoreal aerial of this facility as specified: halls, towers, substation and supply, placed in the landscape SAM measured.
Pulls a satellite view of the site and asks Segment Anything 3.1 for buildings, surface water, solar arrays and open land. The masks become hectares and distances, which replace the country priors for land and water in every estimate of this site, labelled as measured.
| Metric | This mix | Baseline |
|---|---|---|
| Build cost | $168.4B | $168.4B |
| Months to live | 149 | 149 |
| Blended power | $0.082/kWh | $0.082/kWh |
| Utilization | 69% | 69% |
| EBITDA / yr | $49.6B | $49.6B |
| Payback | 3.4 yrs | 3.4 yrs |
| IRR | 13.0% | 13.0% |
| CO₂ / yr | 11,188,222 t | 11,188,222 t |
| Carbon intensity | 320 g/kWh | 320 g/kWh |
| Water / yr | 83,957,746 m³ | 83,957,746 m³ |
| Grid draw vs headroom | 1180% | 1180% |
| Land | 661 ha | 661 ha |
| Permanent jobs | 3,635 | 3,635 |
| Nuisance index | 50 | 50 |
| Industrial power | $0.082/kWh |
| Grid carbon | 320 g/kWh |
| Interconnect lead | 30 months |
| Grid headroom | 400 MW |
| Grid reliability | 96% |
| Construction trades | 15,000 @ $48/h |
| Land index | 3.20× |
| Sentiment | 38 / 100 |
| Climate · water | temperate · low stress |
| Solar · wind | 0.60 · 0.40 |
| Geothermal · flare gas | no · yes |
| People within 5 km | unknown |
| Name | Mix | Score | Payback | Verdict | |
|---|---|---|---|---|---|
| Baseline as reportedbaseline | 100% grid | 56 | 3.4 yrs | Not assessed |