Loading basemap
Sovereign AI build-out announced in 2025.
Supply as reported: Grid with solar
A photoreal aerial of this facility as specified: halls, towers, substation and supply, placed in the landscape SAM measured.
Pulls a satellite view of the site and asks Segment Anything 3.1 for buildings, surface water, solar arrays and open land. The masks become hectares and distances, which replace the country priors for land and water in every estimate of this site, labelled as measured.
Humain hyperscale does not clear the floors as proposed, but the alternative "Hydro PPA + grid" does. Proceed only if the supply mix is changed before permitting; the build plan below is that alternative.
| Metric | This mix | Baseline |
|---|---|---|
| Build cost | $53.2B | $53.2B |
| Months to live | 60 | 60 |
| Blended power | $0.037/kWh | $0.037/kWh |
| Utilization | 62% | 62% |
| EBITDA / yr | $13.8B | $13.8B |
| Payback | 3.8 yrs | 3.8 yrs |
| IRR | 9.8% | 9.8% |
| CO₂ / yr | 3,789,470 t | 3,789,470 t |
| Carbon intensity | 334 g/kWh | 334 g/kWh |
| Water / yr | 19,790,333 m³ | 19,790,333 m³ |
| Grid draw vs headroom | 69% | 69% |
| Land | 1,441 ha | 1,441 ha |
| Permanent jobs | 1,098 | 1,098 |
| Nuisance index | 48 | 48 |
| Industrial power | $0.050/kWh |
| Grid carbon | 500 g/kWh |
| Interconnect lead | 9 months |
| Grid headroom | 1,500 MW |
| Grid reliability | 93% |
| Construction trades | 15,000 @ $16/h |
| Land index | 0.50× |
| Sentiment | 74 / 100 |
| Climate · water | hot · high stress |
| Solar · wind | 1.00 · 0.60 |
| Geothermal · flare gas | no · yes |
| People within 5 km | unknown |
| Name | Mix | Score | Payback | Verdict | |
|---|---|---|---|---|---|
| Baseline as reportedbaseline | 65% grid · 35% solar | 54 | 3.8 yrs | Conditional |
| Supply mix | 60% hydro · 40% grid |
| IT load | 1,200 MW |
| Hardware | B200 · 80 kW racks |
| Crew · automation | 2,500 · 20% |
| Plan scores | 63 · E 65 · Env 51 · C 78 |
| Live in · payback | 60 mo · 3.7 yrs |
| Clears the floors | yes |
| Mix | Viable | Score | Payback | IRR | CO₂ kt/yr |
|---|---|---|---|---|---|
| Hydro PPA + grid 60% hydro · 40% grid | yes | 63 | 3.7 yrs | 11% | 2,455 |
| SMR long-term 70% small · 30% grid | yes | 63 | 3.9 yrs | 10% | 1,855 |
| Gas + solar 50% on-site · 50% solar | yes | 62 | 3.9 yrs | 9% | 2,507 |
| Renewables + SMR 50% small · 30% solar · 20% wind | no | 65 | 4.4 yrs | 7% | 168 |
| Solar + wind + grid backup 40% solar · 30% grid · 30% wind | no | 59 | 4.3 yrs | 7% | 1,788 |
| Gas bridge 70% on-site · 30% grid | no | 58 | 3.4 yrs | 13% | 5,213 |
| Grid + solar 60% grid · 40% solar | no | 55 | 3.9 yrs | 9% | 3,506 |
| Grid + wind 60% grid · 40% wind | no | 55 | 4.0 yrs | 9% | 3,404 |
| As proposed (65% grid · 35% solar) 65% grid · 35% solar | no | 54 | 3.8 yrs | 10% | 3,789 |
| Grid only 100% grid | no | 52 | 3.5 yrs | 12% | 5,836 |